With the teacher’s yearly work model, as the name suggests, the teacher’s workload applies to the year as a whole and not as usual to one week. The following values can contribute to the yearly workload:
Lessons according to the timetable
Reductions , that can be classified as follows:
| • | reductions resulting from lessons held such as preparation, follow-up work, corrections etc. |
| • | reductions that depend on the scale of the teacher’s target workload such as further training |
| • | miscellaneous reductions such as timetable scheduling, theatre group supervision etc. |
The box “Yearly Values“on the “Value Calculation” tab under “Settings | Miscellaneous” must be checked. This causes the tab “Yearly work” to be displayed in the teacher master data.

In addition, a value should be entered for every teacher in the “Plan/Year” field on the “Values” tab in their master data.
